Welding in hot conditions in Saudi Arabia

Welding in hot conditions in Saudi Arabia

This post is also available in: fiSuomi

Pipelines are built in many different places, from freezing cold Siberia to the plains of Central Asia and the scorching deserts in the Arabian peninsula and Africa. Every year, thousands of kilometers of pipelines are installed and maintained in extreme conditions that are incomparable to the steady, stable temperature conditions of the workshop. Pipelines may be installed and repaired at temperatures below -20°C or above +50°C.

When welding is done outdoors, efforts are taken to provide protection using structures such as tents and portable welding cubicles, which are lifted into place to protect the welding site. These solutions protect the weld from snow, rain, and wind, and the welders are also provided with some protection from the weather while they are welding. However, tents are no help in the searing heat, which can reach temperatures of up to +50°C in Saudi Arabia.

Although the weather can cause difficulties, welding must always meet precise quality requirements. Welding is done in accordance with welding procedure specifications, which have been approved using prior welding procedure qualification. Highly demanding welding work is done in extreme conditions, which may impose requirements on monitoring, as well as on the functionality of the welding equipment.

Building the world’s largest oil refinery in Saudi Arabia

Saudi Aramco is the world’s largest oil and energy industry company. It is owned by the Saudi Arabian state, and its headquarters are in Dhahran, near the east coast of the country. Now the company is building the world’s largest oil refinery in Jizan.

The pipelines are primarily being welded with TIG and MMA welding. The root passes and thin-walled pipes are being welded with TIG welding, and all of the filler passes are being done with MMA welding. Kemppi has supplied almost 1,000 MinarcTig Evo 200 devices for the TIG welding carried out by subcontractors on the project, as well as MasterTig MLS 4000 devices for TIG welding and Master S 400 devices for MMA welding.

Oil refinery in Saudi Arabia
The construction site of the world’s largest oil refinery in Jizan, Saudi Arabia.

Temperatures in Jizan are over +30°C all year round, and they can be as high as +50°C during the summer. The international IEC 60974-1 standard requires manufacturers of welding machines to measure and state the duty cycles of welding machines at +40°C. The same standard also requires welding machines to be able to withstand storage temperatures up to +55°C. Experience in Saudi Arabia has also shown that Kemppi’s power sources function flawlessly in hot conditions.

Welders are put under greater strain in hot conditions. Welders’ work can be made easier by using techniques such as mechanized MIG/MAG or TIG orbital welding. However, the problem is that new methods are slow and expensive to introduce. Saudi Aramco requires all welding procedure specifications to meet ISO and ASME requirements, as well as Saudi Aramco’s own requirements.

Welding an 85-inch water pipeline in +40° conditions

In Riyadh, the capital of Saudi Arabia, a pipeline is being welded for the city’s water supply. The conditions in Riyadh are also hot – during the summer, the average temperature is usually +40°C. The pipeline is being built from steel pipes with a diameter of 85 inches and a wall thickness of 15–20 mm (Figure 1). The sections are currently being welded with MMA welding (Figure 2).

However, the company carrying out the welding would like to use more productive methods. Kemppi presented MAG orbital welding to them (Figure 3). The equipment was a FastMig X 450 power source equipped with two WFX 300 P wire feeders and an A5 MIG Orbital System 1500 (Figure 4). The root pass was welded using the WiseRoot+ process with solid wire, and the filler passes were welded with rutile wire in spray arc. The change-over from welding the root pass to welding the filler pass was quick because one of the wire feeders had solid wire and the other had rutile wire.

85-inch water pipes
Figure 1. 85-inch water pipes in Riyadh, Saudi Arabia
MMA pipe welding
Figure 2. MMA welding of butt joints on the pipe
MAG orbital welding
Figure 3. MAG orbital welding of butt joints on the pipe
FastMig X and A5 MIG Orbital System 1500
Figure 4. Kemppi’s FastMig X and A5 MIG Orbital System 1500

To summarize, welding in hot conditions is not normally a problem for the welding equipment if it has been manufactured in line with international quality standards. The IEC 60974-1 standard requires the duty cycle of power sources to be tested at a temperature of +40°C, and the power source must be able to withstand being stored at +55°C.

However, welders are put under greater strain when they work in hot conditions. Switching from manual welding to mechanized welding whenever possible is one way of easing the work of welders while improving quality and productivity. However, this is not always possible due to the precision of prefabrication. On the other hand, scheduling and budgetary constraints may not permit the use of new methods on every project.